Follow the route from the room to the road
Include long communal corridors, paths through gardens, gates and external steps. Estimate the distance and describe uneven surfaces or steep sections. If the load must cross a shared courtyard, confirm permission and access times. The route should be based on a suitable loading location rather than a hoped-for space.
Plan long carrying distances around your Tewkesbury access
Check the route near the moving date as well as when requesting the quote. Tewkesbury’s flood information is a live planning resource; do not interpret an earlier clear route or a property’s own flood status as a guarantee for the whole journey.
For long carrying distances, prepare approximate carrying distance, surface and steps on the route, suitable loading location. Describe the collection and receiving points separately so the quote can reflect the whole job, including any carrying or handling beyond the vehicle.
Relate access to the actual load
Many boxes may require repeated carrying trips, while one large item may need additional handling. Describe heavy or fragile pieces and whether assistance is needed throughout. Trolleys are not suitable for every surface or item, so do not assume equipment will eliminate carrying work. Access changes should be reported before the agreed day.
Include these observations
- Where the vehicle can reasonably load and how far away it is.
- Any gates, slopes, steps or controlled doors.
- Whether the route is shared with residents or the public.
Your Tewkesbury enquiry checklist
- For long carrying distances, have these details ready: approximate carrying distance; surface and steps on the route; suitable loading location.
- Give both full postcodes and the entrance used for the job. Explain whether the Tewkesbury address has private loading space or needs an agreed street position.
- Explain any unresolved permission, timing or handling question before accepting a quote.
- Check the quote’s supplier, price, inclusions and booking terms before confirming.

